Finished up some work on my crawler in preparation for the Texas Round Up next month -
- I had my driver's side spindle bolts pull out of the knuckle so I drilled and replaced all the bolts with grade 8 bolts and nuts on both sides.
- Packed the front wheel bearings, new spindle bearing and new seals.
- Installed new front driver's side brake line and new front brake pads.
- Finished the install of Moser axles up front and rebuilt the Superjoints.
- Installed a WH Wrap Trap.
Should be ready to go!
- I had my driver's side spindle bolts pull out of the knuckle so I drilled and replaced all the bolts with grade 8 bolts and nuts on both sides.
- Packed the front wheel bearings, new spindle bearing and new seals.
- Installed new front driver's side brake line and new front brake pads.
- Finished the install of Moser axles up front and rebuilt the Superjoints.
- Installed a WH Wrap Trap.
Should be ready to go!