Phase 5
Final Pic for Phase 5.
Forgot to mention that the front body mount requires a hole saw and a magnet to install. Hole saw the pocket in the tub, secure the other six body mounts and then drill the bottom of the tub for access. Use the magnet to install the washer and bolt. BTW, all standard bolts will be about 1" to 1 1/2" short. I had accounted for a 1" lift and had gotten bolts that were 1" longer and still missed by an inch on all of them. Pictures to follow this evening.
Final Pic for Phase 5.
Forgot to mention that the front body mount requires a hole saw and a magnet to install. Hole saw the pocket in the tub, secure the other six body mounts and then drill the bottom of the tub for access. Use the magnet to install the washer and bolt. BTW, all standard bolts will be about 1" to 1 1/2" short. I had accounted for a 1" lift and had gotten bolts that were 1" longer and still missed by an inch on all of them. Pictures to follow this evening.