- Joined
- Mar 8, 2007
- Messages
- 81,747
looks "tough" Gonna run like a champ
Will have it tomorrow. I think typical wait time is 12+ months from deposit to completed. I think the time from start to finish is about 3 months give or take.
Specs are posted on their site and easier for me just to copy/paste the link: https://www.highlineclassics.com/1970-ford-bronco-oslo-blueOP, would you mind posting the specs on your build?
We actually modify the frame rails for each build. Cut lower frame rails, move up and re-weld. Then repeat on top side. All custom fab, not a bolt on kit. Just checked out your product tho on your site. Looks great, nice work!Looks like they copied my bumperlifts. I will have to reach out, since it's protected and patent pending.
Well rad! Very nice builds.We actually modify the frame rails for each build. Cut lower frame rails, move up and re-weld. Then repeat on top side. All custom fab, not a bolt on kit. Just checked out your product tho on your site. Looks great, nice work!