• Welcome to ClassicBroncos! - You are currently viewing the forums as a GUEST. To take advantage of all the site features, please take a moment to register. It's fast, simple and absolutely free. So please join our community today!
    If you have problems registering or can't log into your account, please contact Admin.

Assembled Welded Floor Section by Dynacorn

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Well here we are again discussing panel replacement. I have a 1977 Bronco Sport that is "rust free" (PO assurances) and after removing all the paint, bed liner, fiberglass, and bondo I discovered many, many large holes (fist size), aluminum riveted patches, and rusted out panels. (most all)
I thought I should start with the floor then move on to the upper body. Right?
It is hard to make an informed decision when you don't know what you don't know.
After reading all the fit issues with aftermarket panels I have decided to replace all the bad floor panels with the Dynacorn assembled welded floor section ( no instructions included).
Questions:
How much sheet metal (besides the pan and supports) do I remove?
Do the door posts need to come off?
Has anyone else installed this assembly?
Thanks
Greg
 

kip60

Full Member
Joined
Feb 7, 2015
Messages
239
If the supports are still good, or even marginal, leave them in. Treat them with POR-15 or other rust treatment and use them. They will keep the rest of the body where it is supposed to be while you work on the rest.You can cut out the spot welds with a cutter, then cut away the rusted floor. There are other threads on here you can search and see how others have done it. Support the body with jack stands or blocks even before you cut out the floor. You can leave all the vertical metal alone and make the floors fit. Sometimes a better approach is to cut out just the bad and use patch panels instead of all at once. You can buy the floor in up to 10 or 11 pieces to patch the bad areas. That leaves more steel for more support. If you do cut out the floor all at once, I would recommend bracing what is left as much as you can before cutting anything out. The floor has lots of structural support duties and these 40+ years old things can move real easy, usually right where you don't want them to.
 
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Thank you for the sound advice. I have braced door posts above and below and have jack stands in all four corners. Finally I added a brace across the two rear posts on the inside.
The movement you mentioned is what really worries me.
 

kip60

Full Member
Joined
Feb 7, 2015
Messages
239
Thank you for the sound advice. I have braced door posts above and below and have jack stands in all four corners. Finally I added a brace across the two rear posts on the inside.
The movement you mentioned is what really worries me.

Might want to include an x brace from front door post to rear post on the other side and vice versa to keep it from tweaking also.

This might help also.
 

Attachments

  • doormeasurements (1).jpg
    doormeasurements (1).jpg
    79.7 KB · Views: 336
Last edited:
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
I did look at doing that but I was concerned that I would not be Able to lower the floor assembly into place.
 
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Bracing

Based upon advice given I have added bracing to the door posts. Please feel free to comment on the enclosed pictures.
 
Last edited:
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Bracing

I used the following McMaster Carr parts:
6 each Steel Flange PN 68095K266 $15.87 ea
1 each R.H. All Tread 3/4-10 UNC x 6' PN 98957A738--$27.56
1 each L.H. All Thread 3/4-10 UNC x 6' PN 65625A180--$63.48
3 each TurnBuckle 3/4-10 UNC PN 30045T51---$19.75
6 each Hex Nuts RH 3/4-10 UNC PN 90499A837--pack of 25 $ 9.53
6 each Hex Nuts LH 3/4-10 UNC PN 95140A163 --pack of 10 $ 8.01
I drilled 1" diameter counter bores about 5/16" deep in 4 of the steel flanges. The two others I drilled and tapped the holes 3/4-10 RH and LH and used Loctite on the threads.
I decided against welding bracing onto the posts due to the pull of the welds.
With the turn buckles you adjust how much loading you want on each post.
I hope this is helpfulas I am almost flying blind here.
 

stryder94

Jr. Member
Joined
Apr 12, 2009
Messages
56
Did you get the pan in? I'm trying to decide which way to go, use fully assembled pan like this or separate pans.
 
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
No, I am still cutting out sheet metal. I have all the flat sheet metal out. Left the three floor supports in place for now. Trying to decide if I can remove all the floor pan components without removing the four door posts. I will post some more pictures later this week.
 

Past_Miner

Contributor
Bronco Guru
Joined
Oct 22, 2003
Messages
1,021
No, I am still cutting out sheet metal. I have all the flat sheet metal out. Left the three floor supports in place for now. Trying to decide if I can remove all the floor pan components without removing the four door posts. I will post some more pictures later this week.

I know for sure that the front posts don't have to come out to replace the front floor panels. I haven't ever replaced a striker post but I can't see why they would need to come out to R&R the floor.
 
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Complete Floor Removal

Past Miner I agree with your point on the floor panels. But, in order to install the complete floor pan as a welded assembly the inside rocker panels must be removed.
I have enclosed a couple of pictures showing the current progress cutting the floor panels with the plasma cutter.
The third picture shows the partial cutting of the outside rocker panel. I am trying to leave the rocker in place to keep the two door posts from moving.
Next step is the spot weld cutter so I don't damage the panels I want to keep with the plasma cutter.
 
Last edited:

Shulaps

Jr. Member
Joined
May 12, 2013
Messages
55
Loc.
BC Interior, Canada
I used an air chisel to get those remaining pieces of sheet metal off the cross bracing. It worked like a charm. The cross bracing seems a bit thicker and can take the abuse from the air chisel.
 
OP
OP
T

Traveler25

Jr. Member
Joined
Oct 29, 2014
Messages
52
Loc.
Temecula
Pan Removal

Well, I have removed all the floor pans, cross braces, AND the inside rocker panels. see pics.
And par usual I found MORE rust on the lower kick panels.
Thank you for the tip on using the air chisel, it was a big time saver.
I have ordered the new welded floor pan assembly. It is due in later this week.
To the comment from stryder94 I checked the weight of the entire panel with Dynacorn. The welded assembly weighs 200lbs. If it will shoe horn in between door posts I just have to center it on the chassis mounts (4). I have the new mounts that have 1" additional height. I had a hell of a time getting the old mounts out. I have no idea how someone would change these mounts without removing the body.
***FABRICATION TIP** DO NOT GROUND YOUR WELDER OR PLASMA CUTTER TO THE FRAME UNLESS YOU PLAN ON REPLACING THE BURNED OUT FUSE BLOCK!!
 
Last edited:

rydog1130

Contributor
Bronco Guru
Joined
Jun 19, 2014
Messages
4,188
I popped in dynacorns floor pan on my rig and it turned out great
 

pennyduke

Sr. Member
Joined
Jul 18, 2010
Messages
377
Loc.
Stafford
I would love to see some pictures of the Dynacorn pan installed if anyone has some. I'm about to pull the trigger on one myself... Thanks
 
Top