- Joined
- Dec 22, 2005
- Messages
- 736
Got back from Canada, helping a Great Customer finalize his Bronco rebuild with a Coyote install. I told him we would have it running the first day, after a long day cutting it close, hit the key at just about midnight and she fired off.
Dan and his guys did a great job of getting the Bronco together and installing all of the parts, I came in and did some wrap up wiring and small adjustments. Installed the trans controller and wired it to the Centech and Coyote harnesses the first day.
Because we did get it running the first day and I had 1 day left before I had to fly back, we did get a lot of other things done got the hood on, hood shocks installed, got harness tied up, horn washer/ coolant bottle installed added fluids, just more wrap up type of stuff. Got up at 6am the last day worked until 3am, got some breakfast and got on the plane.
Had lots of fun worked hard and got to see Canada (sort of)
Dan and his guys did a great job of getting the Bronco together and installing all of the parts, I came in and did some wrap up wiring and small adjustments. Installed the trans controller and wired it to the Centech and Coyote harnesses the first day.
Because we did get it running the first day and I had 1 day left before I had to fly back, we did get a lot of other things done got the hood on, hood shocks installed, got harness tied up, horn washer/ coolant bottle installed added fluids, just more wrap up type of stuff. Got up at 6am the last day worked until 3am, got some breakfast and got on the plane.
Had lots of fun worked hard and got to see Canada (sort of)