gotdads68
Full Member
- Joined
- Jun 17, 2007
- Messages
- 220
Just curious if welding a temporary brace in place would be a good idea when cutting out and replacing the section above the trans. tunnel where it kicks up into the firewall, or if the dash section is strong enough to keep it from spreading. Floor pans are out already but bracing beneath intact. - Thanks
This piece: http://broncograveyard.com/bronco/i-14165-lower-dash-center-panel.html
This piece: http://broncograveyard.com/bronco/i-14165-lower-dash-center-panel.html
Last edited:











