• Welcome to ClassicBroncos! - You are currently viewing the forums as a GUEST. To take advantage of all the site features, please take a moment to register. It's fast, simple and absolutely free. So please join our community today!
    If you have problems registering or can't log into your account, please contact Admin.

Frame repair

Tonka7777

Sr. Member
Joined
Nov 15, 2010
Messages
466
Loc.
Greenville
Getting my frame cleaned up before galvanized and have a couple questions.

1) 3 of the 8 body mount holes have some pitting around the opening and are thinner than the others, but not rotted through or weak. I have the 3 inch washers to weld over those areas. If I add these washers to strengthen the holes that are questionable, do I need to weld them over the other 5 body mount areas on the frame so all of them are equal and will be level when the tub goes back on? Would I be better off welding them from underneath instead on just the 3 ?

2) I would like to clean up the factory welds on the frame and smooth them out a little bit because they were done really sloppy. Would this compromise the integrity of any of the welds?

I appreciate your input. Thanks!
 

patterdale

Bronco Guru
Joined
May 24, 2010
Messages
1,252
The welds may be sloppy but they have lasted what @40 yrs? Yes cleaning them up may weaken them with out additional welding. They are not that visible when everything is assembled and in my opinion are part of the "character" of the EB. It depends on your intenet for the EB. If you are going to pound it off road, Rock climb, etc. Might be some payoff there. A restore for everyday driver, what's the need? I'd spend time on other things like safety items and comfort upgrades first.
 

trailpsycho

Bronco Guru
Joined
Dec 11, 2003
Messages
4,856
Make sure you weld the washers on each of the body mounts before the galvanizing. Also, make sure you beef up the frame where the PS box mounts, frame horns (you will likely put on a real bumper and ditch those chrome stockers) especially if you intend to put on a winch or a rear bumper with a tire rack and tow hitch.

Anything that will require welding, do it now, before it goes for galvanizing. If you have added any tube (shock mounts, frame tie-ins for the cage, etc) you need to drill a hole in it in two places (1/4-3/8")-larger is better- the holes should be as close to the base of the tube and the top of the tube. These holes do two things, allow super-heated air to escape as the piece goes into the zinc kettle and for the zinc to drain out as it comes out. If you do not, there is a good chance that the super-heated air will cause the trapped air to explode...wrecking your piece and possibly injuring a worker at the plant.

It happens. A buddy of mine was in the industry for ~10 years. He gave me a great deal on dipping my frame, but with all of my mods to the frame, we had to drill quite a few holes on the frame right there in the yard of the plant.... I wasnt sure where and how big to drill; so he said just to wait till I was in town with it. You cant see the holes in the tubes, because they are right near the base where the tube/frame meet. You can see it on the frame tie in plates...hole at center of plates in photos 2 and 3.

Just trying to help out.

Mine ended up turning out awesome. However, we used a Sherman Williams Industrial primer and polyurethane top coat (supposedly suitable for galv)...if I were to do another frame I would have it powder coated instead...flat black or semi-gloss black match very well with the same color of Rustoleum Professional (from Lowes) for touch up...based on my experiences with my other powdercoated items. The powdercoating on the other chasis parts has held up super-awesome. I cant say that for the Sherman Williams coatings. I have had to rattle-can a bunch on the frame. Dont get me wrong, its not rusting. It looks great underneat when the paint peels off...its just frustrating. We even "sweep-blasted" the frame post galv to give a nice tooth and have a fresh/brite zinc for the primer to bite into... It was all done under the supervision of industry pros.

I think a reputable powdercoater would know how to properly prep post galv to get you the best adhesion. Powder is great! Figure ~$300-350 to do the frame...just make sure they know that its being/has been galvanized and try to set it up where you take it directly from one job to the next. The zinc will start to ox quickly and will require a sweep-blast to maximize adhesion.

Good luck and have fun.

John
 

Attachments

  • Picture 188.jpg
    Picture 188.jpg
    95.7 KB · Views: 64
  • Picture 189.jpg
    Picture 189.jpg
    105.6 KB · Views: 63
  • Picture 184.jpg
    Picture 184.jpg
    158.1 KB · Views: 54
Last edited:
Top