I just got a used front driveshaft in and I am having trouble installing it. I installed the CV end first and now the shaft wont collapse enough to clear the pinion nut/bolt. Do you have to install the CV end AFTER the U Joint end? Also, if it's that close, is something wrong? How much space on the splines should it be?
I have a 74 with a 2.5 inch lift.
I'll check the collapsed length when I get home this evening and see if it's 22.25". The one for the Dana 30 is 23.313"...perhaps this is what I got?
The PO deleted the CV so I'm fixing that problem and have nothing to compare to. Pics would help!
Thanks,
Mikey
I have a 74 with a 2.5 inch lift.
I'll check the collapsed length when I get home this evening and see if it's 22.25". The one for the Dana 30 is 23.313"...perhaps this is what I got?
The PO deleted the CV so I'm fixing that problem and have nothing to compare to. Pics would help!
Thanks,
Mikey











