Revelation
Bronco Guru
- Joined
- Oct 9, 2004
- Messages
- 4,815
Finally Rolling Along Faster
For the past 3 weekends I have been going 2 hours north to work on my Bronco. Been in the works for about 2 years and the frame is primed, not a huge step but we have been doing alot of fab work and rust repairs, the frame gets sprayed this week and the front end and rear end will be completed.
Fingers are crossed for a rolling chassis on Sat.!
Done so far.
extended raduis arms by 12 inches
moved front spring towers foward 1 1/2 and lowered 1 1/2(see Pic)
new rear spring mounts
moved trans mount 2 inches back, lowered 3 inches
added gussets to all bumper mount locations
tons of welding, grinding, cutting ect.
Soon the 300, NP435,D-20 will be in place, rolling chassis frist then we locate the motor and fab the mounts, the motor will also be lowered helping with the C.O.G.
We are hoping to be hanging a body on it in about 5-7 weeks, keep your fingers crossed.
If you have a NP435 or adapter cheap please let me know, or I am an electrician and could swap some work. Or if you are in construction and need to have an OSHA 10 or 30 course I am an outreach trainer so we can surely work something out.
That's my Uncle doing all the welding.
For the past 3 weekends I have been going 2 hours north to work on my Bronco. Been in the works for about 2 years and the frame is primed, not a huge step but we have been doing alot of fab work and rust repairs, the frame gets sprayed this week and the front end and rear end will be completed.
Fingers are crossed for a rolling chassis on Sat.!
Done so far.
extended raduis arms by 12 inches
moved front spring towers foward 1 1/2 and lowered 1 1/2(see Pic)
new rear spring mounts
moved trans mount 2 inches back, lowered 3 inches
added gussets to all bumper mount locations
tons of welding, grinding, cutting ect.
Soon the 300, NP435,D-20 will be in place, rolling chassis frist then we locate the motor and fab the mounts, the motor will also be lowered helping with the C.O.G.
We are hoping to be hanging a body on it in about 5-7 weeks, keep your fingers crossed.
If you have a NP435 or adapter cheap please let me know, or I am an electrician and could swap some work. Or if you are in construction and need to have an OSHA 10 or 30 course I am an outreach trainer so we can surely work something out.



That's my Uncle doing all the welding.
Last edited: