Update on product timing
I just got an email from my fabricator and he is wanting to start in on the skid plates. January is usually his claim before the storm, and right now he has some room in his production schedule. Come February or March I run the risk of him getting sidetracked and not making them in time for Super Celebration.
Anyways he said that all he needs total number of skid plates (25), deposit, and he’ll knock them out in 3-4 weeks. I’m thinking it would be better to get the ball rolling now then chance it later. I’ll cover the deposit for and then I’ll have you guys start sending your checks ($150) in week or two.
For the guys who need shipping I’ll have you send the checks after we figure out the total cost with ship.
Let me know your thoughts???