Body work is done except for top, we will deal with that later next week. Prep for epoxy over the bare spots and body filler tomorrow, will spray epoxy first thing Monday morning. Take of all of next week to prime and block.
Bam, where you been, have not seen you on here in a while.looking good.
Everything looks good, high build later this week and it will be ”block party” time.
there used to be a place in Jackson, ms that did acid dip. they had a deal worked out with a sub contractor for Nissan. They closed the metal strip place, so we do not have that option anymore. It cost me a little over 2k to have the body and frame done.Where were you able to get the acid dip and ecoat done?
Looking really good. It is indeed work getting the body work done!
Thank you sir!I'm taking a nap for you.
I don't want you to get tired and slow down.