msommer001
Sr. Member
- Joined
- Jan 15, 2009
- Messages
- 435
I am about 1/3 through my transplant. I say that becasue I am carefully removing the bad sheet metal and keeping the good. In this case, the inner rocker and floor pan must go and the outter rockers stay, it is brand new with zero rust or defomitity. All of the floor pan and inner rocker is gone.
Here is where I need some wisdom, the front floor pan support rail is about 3/4" to 1" higher then where the top of the inner rocker will be, as shown in photos. the body mount itself is soild. I will have to raise the outter rocker and kick panel to align the rail spport rail. I have to patch the second one back so aligning it will no be an issue.
I did not brace becasue the area around the body mounts where completly rusted and providing no suppport so i did not want to reinstall new metal in the wrong positions.
My plan is to clean up all the surfaces needed, then place the inner rocker allowing for connection to the support rails. I plan to use a jack and some lumber to not damage the sheet metal and spread out the load, to lift the outter rocker and kick plate until the support rail is in the right location then sheet metal screw it to the inner rocker, already fastened to the outter rocker. The door is hung and will be used each step to ensure margins and function. Once the inner rocker and support rails are in place I will test fit the floor pan and screw together. Once margins and door fucntions are good I will tack the inner rocker, outter rocker, and support rails in place and remove floor pan, then finish weld those pieces and then refit floor pan to verify and screw and weld.
As always thanks for the feedback.
Mark
Here is where I need some wisdom, the front floor pan support rail is about 3/4" to 1" higher then where the top of the inner rocker will be, as shown in photos. the body mount itself is soild. I will have to raise the outter rocker and kick panel to align the rail spport rail. I have to patch the second one back so aligning it will no be an issue.
I did not brace becasue the area around the body mounts where completly rusted and providing no suppport so i did not want to reinstall new metal in the wrong positions.
My plan is to clean up all the surfaces needed, then place the inner rocker allowing for connection to the support rails. I plan to use a jack and some lumber to not damage the sheet metal and spread out the load, to lift the outter rocker and kick plate until the support rail is in the right location then sheet metal screw it to the inner rocker, already fastened to the outter rocker. The door is hung and will be used each step to ensure margins and function. Once the inner rocker and support rails are in place I will test fit the floor pan and screw together. Once margins and door fucntions are good I will tack the inner rocker, outter rocker, and support rails in place and remove floor pan, then finish weld those pieces and then refit floor pan to verify and screw and weld.
As always thanks for the feedback.
Mark











