Robert, Sorry, but I didn't take any pics. I installed the pipe clamps about 2" from each end then evenly spaced across the rest of it. I placed the 1"x2" strips about 1/2" down from the top, under the pipe clamps, then installed the "C" clamps. The "C" clamps I snugged down to hold them in place then tightened the pipe clamps to pull the bottom tight. I started from the center two and worked out to each end. Then I tightened all the "C" clamps also working from the center out each way to the outside. The adhesive squeezed up out the top a little, which I sanded flush with the transition when it was dry the next day. Hope this helps.
Mark.