Hey Drew, did you get all the insulation and electrical work done on your shop? Gonna have to come up and test out those RV hook-ups when installed! Need 'em done before All Fords!
Insulation and interior metal siding is all in. Most of the lights and one of the ceiling fans are up. When Lou finally gets done dicking around with his rig he's gonna finish the rest of the electrical ;D I need to finish the interior metal trim work around the garage doors and we're going to build a man/forklift door to connect the heated shop bays from the cold storage bay.
I have an RV box I got from Jed at Blue Rocks ready to mount on the back end that will have 120 20A, 120 30A RV, 220 50A (so I can run a pressure washer, welder or plasma of the end of the building in case I want to wotk on something or part out a rig outside) and shop air.
We'll also be putting 120 20A, 120 30A RV outlets on the front end as well where I hope to have water and sewer hookups maybe later this year.
I've been too lazy and have not taken too many pics lately. When I get some more done I'll create a new thread to show some of the upgrades.
I'll definatly have all the electrical hookups for All-Ford, right Lou
![Wink ;) ;)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
.
I also got a 10K pound Rotary 2 post lift that we'll be installing in a couple weeks that might be handy for the MEB cookout/Tech weekend.
....Sorry for the hijack Lou! Now back to our regularly scheduled programming of the sexying up of Lou's rig!....
Looking sweet!
![Smile :) :)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)