Some more good progress was made in the last couple of days. Dave (Bruners4) and I, installed the upper intake and induction unit. Hooked up the last few hoses. Such as the charcoal cannister and vent at the oil filter tube to the induction port before the throttle. The pvc valve to the upper plenum and the hose to the fuel rail pressure regulator. Earlier in the day, I setup the throttle cable. Then we filled all the fluids as best as we can, pre start up. And removed all the spark plugs. So we could crank over the engine and check for oil pressure. When we quit cranking, I witnessed the dash guage had reached 50 psi. Great news. Not having any fuel on hand and getting late on another sweltering day. We moved on and made short work of installing the Lokar shifter linkage. Then we called it a day. Here are a few pictures of the progress.
Today, I proceeded with tying up loose ends. Preparing for first start up, hopefully next week. So one of the projects left in the engine bay. Is bending up the brake lines for the master cylinder to the proportioning block. And I got as far as bleeding the master cylinder. So the brakes are ready for bleeding.
Today, I proceeded with tying up loose ends. Preparing for first start up, hopefully next week. So one of the projects left in the engine bay. Is bending up the brake lines for the master cylinder to the proportioning block. And I got as far as bleeding the master cylinder. So the brakes are ready for bleeding.










