BigBlueBronco71
Full Member
I have the WH floorpans and im planning to butt weld where they mate up at the pedals just below the firewall (the angles portion) because I think it will look better than an overlap,
so how can I set the gap for the butt weld correctly, ive seen a few options like butt weld clamps, screw the pan down in the correct position, or even overlap and cut through both pieces for the right gap, anybody done this or have some input/ideas, id like right around 1/32 gap for good penetration with minimal blow through
I know most people will say to just overlap and be done with it, but id like to hear the options for butt welding
so how can I set the gap for the butt weld correctly, ive seen a few options like butt weld clamps, screw the pan down in the correct position, or even overlap and cut through both pieces for the right gap, anybody done this or have some input/ideas, id like right around 1/32 gap for good penetration with minimal blow through
I know most people will say to just overlap and be done with it, but id like to hear the options for butt welding











